Turkeve

Development options for Turkeve well Ny-7 are being considered to bring this well into produciton

JKX entered into a farm-in agreement to earn 50% of future mining plots formed to develop discoveries via participation in the drilling of up to seven shallow wells located in the Turkeve area of north east Hungary in late 2010.

  • Turkeve Ny-7 well encountered gas but with more than 25% of carbon dioxide. The operator is evaluating treatment and development options with a view to bringing the field into production
  • limited rate pilot production is planned from Ny-7 with full rate production expected once a suitable development option is approved.

Turkeve reserves

Based on the proposed development plan, Turkeve P50 reserves are 3.2 Bcf gas and 70 Mbbl condensate (net to JKX 0.3 MMboe).

Operations Map

Operations map

Image Gallery

Image Gallery View Images

Our People

Meet the people working at JKX

JKX