Hernad

The Hadjunanas and Gorbehaza fields produce from three wells and via a processing faciclity into the Hungarian gas pipeline system

Hadjunanas and Gorbehaza fields

The Hajdunanas Field was discovered in May 2008 with successful gas tests from three levels in well Hn-1. The discovery was confirmed by a second well Hn-2 which encountered a thicker sequence of Pannonian sands. The reservoirs include two Pannonian sand intervals and a Miocene fractured volcanoclastic sequence.

The Gorbehaza discovery well Gh-1 has been tied in the Hadjunanas facility. Gas quality is excellent and requires minimal processing before export.

Remaining reserves
as at 31 December 2011

 ProvedProbableProv+Prob
Oil (MMbbl) 0.3 0.0 0.3
Gas (Bcf) 2.2 2.6 4.8
Oil + Gas (MMboe) 0.7 0.4 1.1

Operations Map

Operations map

Field Selector

Image Gallery

Image Gallery View Images

Our People

Meet the people working at JKX

JKX